Alpine Saunas RWH300 Series Assembly Manual Download Page 5

1

2

3

4

5

9

10

11

12

13

14

15

No.

Name

Quantity

1

2

3

4

5

6

Stave

Front Wall

Steel strip

Outside bench

Cup holder

Robe hook

66

1

1

1

2

2~4

No.

Name

Quantity

7

8

9

10

11

12

Heater fence

Backrest (Optional)

Inside bench

Inside floor

Back Wall

Sauna Heater (Optional)

1

2-8

1-3

1

3~9kw

2

- 5 -

13

Magazine rack

1

16

Wooden components of sauna

6

14

Outside Floor

1

7

8

15

16

Decoration board

20

Base

2-5

Summary of Contents for RWH300 Series

Page 1: ...l Outdoor Sauna IMPORTANT Watch Assembly Video in conjunction with this manual YouTube Link www alpinespas co nz assembly Finland Pine edar Series with anopy C c Finland Pine edar Series without anopy...

Page 2: ...9 14 10 17 2 3 4 5 6 7 8 1 Base assembly Front and back wall assembly Stave assembly Stainless steel bands assembly Bench assembly Heater and lamp holder assembly Other assembly Bitumen proof assembl...

Page 3: ...hen sauna like jade necklaces watches etc are easy absorption of heat may be burn the skin 8 Do not apply cosmetics because it can block pore prevent sweat evaporation 9 Sauna is not suitable for the...

Page 4: ...g use If you want to assemble accessories providedby other companies to the sauna try to avoid metal accessories or insulate them 4 Please find qualified electricians to install the electrical element...

Page 5: ...bench Cup holder Robe hook 66 1 1 1 2 2 4 No Name Quantity 7 8 9 10 11 12 Heater fence Backrest Optional Inside bench Inside floor Back Wall Sauna Heater Optional 1 2 8 1 3 1 3 9kw 2 5 13 Magazine ra...

Page 6: ...l assembly 1 2 1 2 3 4 Align Apply silicone reach 1 1cm The accessories of back wall Base Left part of back wall Middle part of back wall Right part of back wall 1 2 3 Left part of back wall Middle pa...

Page 7: ...t wall 7 Bracket of bench inside The level bar shows the levelness Level bar Air outlet hole Air intake hole 3 4 5 6 Left part of front wall Right part of front wall Middle part of front wall 7 8 The...

Page 8: ...L e A1 gla ss silicone seala nt gla ss silic one seala nt A1 Apply silicone reach 1 1cm 2 Apply silicone reach 1 1cm Front wall back wall Stave 30pcs with screw holes ST5 50 Center line Stave with scr...

Page 9: ...s in front and back must completely cover screw holes for front and back wall assembly 9 The steel strip lock should be in symmetry namely at 4 O clock or 8 O clock Long steel strip place upside Short...

Page 10: ...k walls to make screw holes of the bench on the bracket of front and back wall and fasten the benches by screws Note no need to assemble outside bench for the sauna series without canopy 1 2 3 4 Suppo...

Page 11: ...r outside Magazine rack 1 2 Sauna heater holder Sauna heater 1 3 Sauna heater fence ST5 50 Sauna light assembly o heater installation manual for details Please refer t heater fence installation Please...

Page 12: ...7 heater fence cup holder robe hook floor Installation of other accessories for reference ST4 30MM Robe hook Cup holder Outside Floor 12 1 2 1385 mm 718 mm 230 mm 918 mm 1600 mm...

Page 13: ...y for 10 20 minutes 5 After re entering the sauna you may find there are drops formed by vapor on sauna stones If water drops to the ground it means you are overusing the sauna 6 At least rest for 20...

Page 14: ...Instructions for Assembly Bitumen Roof Canopy on Sauna 14...

Page 15: ...quired Standard component 1 3 3 screws required Standard component 1 4 3 screws required RWH300 M65 RWH300 M65C 6 feet 7 feet 1070mm 870mm Distance Specifications 2 1 NOTE Take off the rear thin film...

Page 16: ...6 7 A 1 Parts indicated B 2 Parts indicated Right Wrong ST4X20 asher Gap covered by overlapping Asphalt Shingles on the W Combination of a hexagon ST4X20 Washer Linking part installation ST4X20 Washe...

Page 17: ...on external wooden parts of sauna to prevent corrosion crack and tarnish 2 Suggestions after assembling sauna wash interior twice a day for 2 3 days 3 It is suggested to lay a carpet before the door t...

Reviews: