TUBING AND COMMISSIONING
•
Connect the tubes to the thread inputs marked with IN and OUT
•
The other thread input must be closed by the screw plug:
•
Now fill the Eisball with a funnel through the upper fillport. The optimal filling height is
10mm below the upper fillport opening:
Use the screw tool.
10 mm
We only recommend clear coolants
from our own production (CKC or
Eiswasser Crystal - no UV!) or pure
distilled or osmosis filtered water.
After commissioning the pump for the
first time, the water level drops.
Therefore, liquid should be refilled
during use.
Summary of Contents for EISBALL
Page 1: ...EISBALL...
Page 2: ...Eisball Alphacool International GmbH 1...
Page 4: ...Eisball Alphacool International GmbH 3 40 40 LED 43 LED 43 RGB 43 44...
Page 9: ...Eisball Alphacool International GmbH 8 L fterhalterung...
Page 15: ...Eisball Alphacool International GmbH 14...
Page 20: ...Eisball Alphacool International GmbH 19 Fan bracket...
Page 30: ...Eisball Alphacool International GmbH 29 Support de fixation du ventilateur...
Page 38: ...Eisball Alphacool International GmbH 37 mm 700 ml 3...
Page 39: ...Eisball Alphacool International GmbH 38 50 mm Eisball VPP655 VPP755...
Page 40: ...Eisball Alphacool International GmbH 39...
Page 41: ...Eisball Alphacool International GmbH 40 1x O 1x 1x 1x M4x5 Eisball Eisball 1 2 1 1...
Page 42: ...Eisball Alphacool International GmbH 41 M3x5 M3 5 2...
Page 43: ...Eisball Alphacool International GmbH 42 M4x5 M3x5 2 1 2...
Page 44: ...Eisball Alphacool International GmbH 43 LED LED LED RGB aRGB...
Page 45: ...Eisball Alphacool International GmbH 44 IN OUT Eisball 10 mm 10 mm CKC Eiswasser Crystal UV...
Page 46: ......
Page 47: ......
Page 48: ......