![Alpha-InnoTec Hydraulic tower HT7 Operating Manual Download Page 9](http://html1.mh-extra.com/html/alpha-innotec/hydraulic-tower-ht7/hydraulic-tower-ht7_operating-manual_2906144009.webp)
9
Subject to technical amendments without prior notice | 83070100bUK | ait-deutschland GmbH
5.5 Installation
Installation site
IMPORTANT
Install the unit inside buildings only.
The installation area must be frost-free and dry. It must
meet the relevant local regulations.
“Installation plans”, page 24, and “Dimensional
drawings”, page 23
1. Place the unit on a stable, solid and horizontal
surface, preferably with structural sound insula-
tion.
2. Tilt the unit slowly and carefully from one side.
3. Secure the unit raised at an angle so that it cannot
accidentally tilt back to the initial position.
4. Install the adjustable feet (
①
) on all 3 feet.
1
5. Tilt the unit back to the initial position slowly and
carefully.
6. Adjust the 3 adjustable feet so that they are bal-
anced.
7. If the hydraulics have been removed for transport
reasons, screw the hydraulics back on to the tank.
7.1.
IMPORTANT
When mounting the hydraulic system, insert the ca-
ble of the domestic hot water temperature sensor
through its grommet into the support plate. Take care
not to damage the cable.
7.2.
7.3.
4x