ADM-XRC-7Z1 User Manual
V2.6 - 14th February 2022
3 Installation
3.1 Software Installation
Please refer to the Software Development Kit (SDK) installation CD. The SDK contains drivers, examples for
host control and FPGA design and comprehensive help on application interfacing.
3.2 Hardware Installation
3.2.1 Handling Instructions
The components on this board can be damaged by electrostatic discharge (ESD). To prevent damage, observe
ESD precautions:
- Always wear a wrist-strap when handling the card
- Hold the board by the edges
- Avoid touching any components
- Store in ESD safe bag.
3.2.2 Installation in ADC-XMC-Breakout Carrier
Note:
Note: This operation should only be performed while the ADC-XMC-Breakout carrier is not powered.
The 7Z1 should be secured to the ADC-XMC-Breakout carrier using M2.5 screws in the four holes provided.
Refer to the ADC-XMC-Breakout carrier documentation for switch configurations.
Page 4
Installation
ad-ug-1253_v2_6.pdf