![Alpha Boilers Alpha C23 Installation And Servicing Instructions Download Page 21](http://html.mh-extra.com/html/alpha-boilers/alpha-c23/alpha-c23_installation-and-servicing-instructions_2905431021.webp)
21
8.5
MAIN BURNER
1.
Remove the burner as described in Routine Servicing, section 7.2.
2.
Re-assemble with a new burner as described in Routine Servicing, section 7.4.
8.6
BURNER INJECTORS
1.
Remove the burner as described in Routine Servicing, section 7.2.
2.
Unscrew the damaged injector and screw in a replacement.
3.
Re-assemble as described in Routine Servicing, section 7.4.
8.7
FAN - Fig. 20
1.
Gain access to the combustion chamber as in section 8.1.
2.
Disconnect the fan wiring.
3.
Remove the three screws securing the fan to the flue hood. Fit the new fan and re-assemble in reverse order.
Note: Connect the fan wiring, blue to terminal N, brown to terminal L and green/yellow to terminal
.
4.
Re-assemble and test the boiler as described in Routine Servicing, section 7.4 paragraphs 5 to 9.
8.8
AIR PRESSURE SWITCH - Fig. 20
1.
Gain access to the combustion chamber as in section 8.1.
2.
Disconnect the pressure sensing tube.
3.
Remove the fixing screw and disconnect the wiring.
4.
Connect the wiring to the new switch. The polarity of the wires is not important.
5.
Secure the new switch in position and connect the pressure sensing tube to the connection nearest the front.
6.
Re-assemble in reverse order.
8.9
OVERHEAT THERMOSTAT - Fig. 20
1.
Gain access to the combustion chamber as in section 8.1.
2.
Disconnect the wiring from the overheat thermostat.
3.
Remove the spring clip and remove the overheat thermostat from the heat exchanger.
4.
Fit the new overheat thermostat and re-assemble in reverse order.
Alpha C23/27 - Component Replacement
Fig. 19
Flame sensing
electrode (rear)
3 mm
Ignition
electrode (front)
6 mm
Summary of Contents for Alpha C23
Page 27: ...27 9 1 ILLUSTRATED WIRING DIAGRAM Alpha C23 27 Wiring Diagrams 9 WIRING DIAGRAMS ...
Page 28: ...28 Alpha C23 27 Wiring Diagrams 9 2 FUNCTIONAL FLOW WIRING DIAGRAM ...
Page 30: ...30 Alpha C23 27 Fault Finding 10 3 DOMESTIC HOT WATER Follow operational sequence ...
Page 31: ...31 Alpha C23 27 Fault Finding 10 4 FAULT FINDING SOLUTIONS A to F ...
Page 32: ...32 Alpha C23 27 Fault Finding 10 5 FAULT FINDING SOLUTION SECTIONS G to L ...
Page 35: ...35 Alpha C23 27 ...