3. Installation
3.1 Installation Method
The site where you install the switch may greatly affect its performance. When installing,
please take the following into consideration.
-
Install the switch in a cool, dry place. See technical specifications for the acceptable
temperature and humidity operating ranges.
-
Install the switch on a secure, level surface that can support its weight, at least 5Kg.
-
Before connecting the Power Cord please ensure the appropriate voltage switch is
set, this switch can be found at the back of the POEFE24TV2.
-
Leave at least 10cm of space at the front and rear of the switch to ensure adequate
ventilation.
3.2 Desktop or Shelf Installation
When installing the switch on a shelf or desktop please ensure guidelines above are
followed, including level surface and adequate ventilation.
3.3 Rack Installation
The POEFE24TV2 is a rack mountable switch and can be installed in an EIA-19 based
equipment rack. First install the provided rack mount brackets onto each side of the switch
using the screws provided. Using the screws provided with your rack mount the switch into
your equipment rack.
Fig. 2 Rack Mount kit installation
Fig. 1 Desktop installation