AllMounts AS0246TP Installation Manual Download Page 3

4

3

1. Installing the Rubber Pads

2. For the model AS01K installation

    

(Assembly based on the accessories selected by user.)

Attach the power socket to the back of column using the appropriate screws. Tighten all screws with a
phillips screwdriver.

P-G

AS02H

AS02

AS03V/AS02P

AS02R

  CPU holder (x1)

T-A

Package P 

laptop cabinet (x1)

T-D

support rod (x2)

T-F

camera shelf (x1)

T-G

connecting piece (x1)

T-B

silicone pad (x8)

P-C

 DVD shelf (x1)

T-C

Package P 

key (x1)

P-F

M6x8 (x4)

P-D

AS01K

 power socket (x1)

T-H

M6x8 (x4)

P-A

4mm Allen key (x1)

P-B

AS03V only

D6 washer (x4)

P-E

connecting piece (x1)

T-E

ST4.8x9.5 (x4)

P-G

The following accessories are optional.

3a. For Concrete Floor Mounting 

60mm

(

2.4"

)

62mm

(

2.4"

)

ø12

m

m

(

ø 

1/

2 "

T-H

• Lift the steel base by grasping the cable ties.
• Peel off the backing paper from the rubber pads and stick the rubber
  pads on to the steel base.

Mark the exact location of mounting holes and pre-drill these mounting holes with a 12mm drilling bit to
at least  62mm in depth. Remove the dust in the holes.

First tighten the iron expansion bolts with an Allen key, 
and then loosen the iron expansion bolts in order to
separate  the bolts and the expansion tubes.

• Attach the connecting plate to the bottom of the column using the appropriate
  screws. Tighten all screws with an Allen key.
• Insert an expansion tube into each of these holes. Using the bolts mount the
  column to the floor. Tighten all screws with an Allen key.

A

G

I

M

M

T

T

R

H

Summary of Contents for AS0246TP

Page 1: ...tributor if you have any questions 5 12 AS03V Note The accessories are not standard equipped The accessories will be selected according to user requirement AS02 AS02H AS01K AS02R AS02P Optional Access...

Page 2: ...quipment to safely lift and position the equipment Tighten screws firmly but do not over tighten Over tightening can cause damage to the items This greatly reduces their holding power This product is...

Page 3: ...ories are optional 3a For Concrete Floor Mounting 60mm 2 4 62mm 2 4 12mm 1 2 T H Lift the steel base by grasping the cable ties Peel off the backing paper from the rubber pads and stick the rubber pad...

Page 4: ...etal plate metal plate 4 For the model AS02H installation Assembly based on the accessories selected by user P A 4 1 Installing the CPU holder on the back of the column Insert the CPU holder to the re...

Page 5: ...embly based on the accessories selected by user NOTE With the arrow pointing upward P D P E Attach the connecting piece to the laptop cabinet using the appropriate screws and washers Tighten all screw...

Page 6: ...e as possible to the center of the display Screw the adapter brackets onto the display Note Choose the appropriate screws washers and spacers if necessary according to the type of screen or or or M G...

Page 7: ...U P K Attach the top cover to the column using the appropriate screws Tighten all screws with an Allen key 12 Cable Management Insert the cable clamps horizontally into the plate slots then turn the c...

Page 8: ...del AS02P installation Assembly based on the accessories selected by user Attach the laptop cabinet to the connecting piece on the universal plate using the appropriate screws Tighten all screws with...

Reviews: