17
INSTALLATION
Before starting installation, you should carry out the following checks, as well as making sure the structure is
GB
compliant with current standards. Specifically:
Check that the wall and/or column are in good condition. If they are not, the fastening points will need
to be reinforced.
Make sure that the travel of the shutter is not obstructed in any way. The shutter must not have
friction, the movement in aperture and in closure must be free If stopped in any position it must not
move. During movement it must not slip.
Follow the dimensions, create a solid concrete footing and fix the base plate to the ground immerging
it into the concrete using the bracket clamps and fixing screws (fig.4). If the base already exists use
robust expanding wedges.
Provide one or more pipelines for the laying of electrical cables.
Electrical
pipeline
Fig.4
N.B. IT IS NECESSARY TO KNOW THE DIMENSIONS OF THE RATCHET IN ORDER TO CALCULATE
WITH PRECISION THE POSITION OF THE COUNTER-PLATE.
Summary of Contents for IND4000K/T
Page 64: ...6 1624019 rev00 MADE IN EC ...