507276-03
Page 16 of 59
Issue 1621
Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
1. Measure and cut vent pipe to desired length.
2. Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3. Clean and dry surfaces to be joined.
4. Test fit joint and mark depth of fitting on outside of pipe.
5. Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
NOTE:
Time is critical at this stage. Do not allow primer
to dry before applying cement.
NOTE:
A sheet metal screw may be used to secure the
intake
pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
DANGER
Table 3
OUTDOOR TERMINATION KITS USAGE
A96UH2E
95G1UHE
VENT
PIPE
DIA.
(in.)
STANDARD
CONCENTRIC
Outdoor
Exhaust
Accelerator
(Dia. X
Length)
Outdoor
Exhaust
Accelerator
(Dia. X
Length)
Flush
Mount
Kit
1-1/2"
Concentric
Kit
2"
Concentric
Kit
3"
Concentric
Kit
1-1/2" x12"
2" x12"
51W11**
71M80
OR
+44W92++
69M29
OR
+44W92++
60L46
OR
44W93+
030
045
2
YES
YES
YES
2-1/2"
YES
YES
YES
3
YES
YES
YES
70
2
YES
YES
YES
2-1/2"
YES
YES
YES
3
YES
YES
YES
90
2
YES
YES
YES
YES
2-1/2"
YES
YES
YES
YES
3
YES
YES
YES
YES
110
2
YES
YES
YES
YES
2-1/2"
YES
YES
YES
YES
3
YES
YES
YES
YES
135
3
YES
YES
YES
* Requires field provided end installed 1-1/2” exhaust accelerator.
** kit 51W11 is provided with e 1-1/2” eccelerator which must be used for all 45,000 and 70,000 furnace installations.
+Termination kits 44W92, 44W93, 30g28 & 81J20 approved for use in Canadian installations to meet CSAB149.
++The 44W92 Concentric kit is provided with a 1-1/2” accelerator which must be installed on the exhaust oulet when
this kit is used with the 45,000 and 70,000 furnaces.
Summary of Contents for 95G1UHE
Page 3: ...507276 03 Page 3 of 59 Issue 1621 EXPANDED VIEW Figure 1 ...
Page 22: ...507276 03 Page 22 of 59 Issue 1621 Figure 25 Figure 26 ...
Page 28: ...507276 03 Page 28 of 59 Issue 1621 Figure 34 ...
Page 38: ...507276 03 Page 38 of 59 Issue 1621 Figure 57 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Page 40: ...507276 03 Page 40 of 59 Issue 1621 Figure 59 Figure 60 ...
Page 44: ...507276 03 Page 44 of 59 Issue 1621 TYPICAL WIRING DIAGRAM Figure 65 ...
Page 57: ...507276 03 Page 57 of 59 Issue 1621 Start Up Performance Check List ...