Chapter 7: Building the Trunk with the Default 10Gbps Stacking Ports
158
Monitoring the Initialization Processes
It takes about two minutes for the switch to initialize its management
software programs and features, and load the default configuration. You
can monitor the bootup sequence by connecting a terminal or computer
with a terminal emulator program to the Console port. (The Console port
settings are provided in “Starting a Local Management Session” on
page 150.) The switch displays the messages in Figure 88 through
Figure 90 on the Console port as it initializes the management software.
Figure 88. Switch Initialization Messages
Bootloader 6.2.12 loaded
Press <Ctrl+B> for the Boot Menu
Reading flash:x530L-5.5.0-2-rcl.rel...
Verifying release... OK
Booting...
Starting base/first...
[
OK
]
Mounting virtual filesystems... [
OK
]
______________
____
/\ \
/ /______\
/
\ \_
__/ /| ______ |
/
\ |
|
/
| ______ |
/
\ \
/ /
\ ____ /
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v5.5.0
Current release filename: x530L-5.5.0-2-rcl.rel...
Built: Mon Nov 26 01:57:50 UTC 2021
Mounting static filesystems...
[
OK
]
Attaching to /dev/mtd0...
[
OK
]
Mounting file system...
[
OK
]
Checking for last gasp debug output...
[
OK
]
Checking NVS filesystem...
[
OK
]
Mounting NVS filesystem...
[
OK
]
Initializing random number generator...
[
OK
]
Starting base/hwrandom...
[
OK
]
Starting base/jitterentropy-rngd...
[
OK
]
Starting base/dbus...
[
OK
]
Starting base/linux...
[
OK
]
Starting base/syslog...
[
OK
]
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...