Chapter 5: Installing the Switch in an Equipment Rack
124
3. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 67.
Figure 67. Installing the Switch in an Equipment Rack
4. After installing all the switches of the stack:
To build the stack with the default stacking ports, refer to Chapter
7, “Building the Trunk with the Default 10Gbps Stacking Ports” on
page 141.
To build a stack of x530L-10GHXm or x530L-18GHXm switches
using 5Gbps ports for the trunk, refer to Chapter 8, “Building the
Stack Trunk with 5Gbps Multi-Speed Ports” on page 161.
51
52
49
SFP
50
1G
/
100
FAULT
POWER
USB
ON
AC
T
ERR
CLAS
S 1
LASER
PRO
DUC
T
CONSOLE
A
T-x530-2
8GTXm
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...