
Chapter 2: Beginning the Installation
63
Unpacking the Product Package
To unpack the product package, perform the following procedure:
1. Remove all the components from the shipping box. Refer to Figure 14.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
Figure 14. Removing the Switch from the Shipping Box
Summary of Contents for IE340 Series
Page 10: ...IE340 Series Installation Guide 10...
Page 14: ...Tables 14...
Page 18: ...IE340 Series Installation Guide 18...
Page 52: ...IE340 Series Installation Guide 52...
Page 62: ...IE340 Series Installation Guide 62 Figure 13 Space Issue Between SFP Module and Copper Port...
Page 68: ...IE340 Series Installation Guide 68...
Page 86: ...IE340 Series Installation Guide 86...
Page 94: ...IE340 Series Installation Guide 94...