AT-x950-28XSQ Switch and VCStack Installation Guide
133
Verifying the
Master Switch
Perform the steps in Table 17 on page 133 to confirm the configuration of
the master switch.
Table 17. Verifying the Master Switch
Step
Description and Command
1
Start a new local management session on the master switch.
2
Move to the Privileged Exec mode with the ENABLE command.
awplus> enable
3
Enter the SHOW STACK command and check the display for the following:
- The table should have two switch entries, with the IDs 1 and 2.
- Switch ID 1 is the master switch.
- The master switch should have the priority 1. If it does not, repeat “Configuring the
Master Switch” on page 130. Be sure to perform the STACK PRIORITY command
and to save your changes with the WRITE command.
- Switch ID 2, with its empty fields, is for the provisioned member switch. If the table
does not include this switch, repeat “Configuring the Master Switch” on page 130.
Be sure to perform the SWITCH PROVISION command and to save your changes
with the WRITE command.
- The Operational Status should be Standalone Unit, indicating that stacking is
enabled and that the unit is operating as a stack of one switch. If the status is
Stacking Hardware Disabled, the stacking feature is disabled. Repeat “Configuring
the Master Switch” on page 130. Be sure to perform the STACK ENABLE command
and to save your changes with the WRITE command.
awplus# show stack
Virtual Chassis Stacking summary information
ID Pending ID
MAC address
Priority
Status
Role
1
-
e01a.ba56.c208
1
Ready
Active Master
2
-
-
-
-
Provisioned
Operational Status
Standalone unit
Stack MAC address
0000.ab56.d4a8 (Virtual MAC)
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...