103
Chapter 7
Installing the Switch on a Wall
The procedures in this chapter are listed here:
“Switch Orientations on a Wall” on page 104
“Recommended Minimum Wall Area Dimensions” on page 105
“Plywood Base for a Wall with Wooden Studs” on page 107
“Installation Guidelines” on page 109
“Installing the Plywood Base” on page 111
“Installing the Switch on the Plywood Base” on page 112
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...