
AT-x550 Series Installation Guide for Virtual Chassis Stacking
155
What to Do Next
After configuring the master switch, do the following:
1. Power off the switch by disconnecting its AC power cords from the AC
power sources. Refer to Figure 76 on page 155.
Figure 76. Powering Off the Switch
2. Configure the member switches. Refer to “Configuring Member
4
Enter the SHOW RUNNING-CONFIG command to display the running configuration
of the master switch.
awplus# show running-config
Use the display to confirm that you designated the correct trunk ports for the master
and member switches. The ports should be designated with INTERFACE PORT and
STACKPORT commands. In the following example, ports 15 and 16 on the master
and member switches will be the stack trunk:
interface port1.0.15-1.0.16
stackport
.
interface port2.0.15-2.0.16
stackport
.
interface port3.0.15-3.0.16
stackport
.
interface port4.0.15-4.0.16
stackport
5
Go to “What to Do Next” on page 155.
Table 23. Verifying the Master Switch (Continued)
Step
Description and Command
Summary of Contents for AT-x550-18XSPQm
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 78: ...Chapter 2 Virtual Chassis Stacking 78 ...
Page 90: ...Chapter 3 Beginning the Installation 90 ...
Page 110: ...Chapter 4 Installing the Switch on a Table or in an Equipment Rack 110 ...
Page 124: ...Chapter 5 Installing the Switch on a Wall 124 ...