Chapter 12: Replacing Modules
242
Section II: Installing the Chassis
Figure 154. Reinstalling the Screws on the Positive and Negative
Terminals
8. Slide the plastic cover to the left and lightly tighten the two screws to
secure it in place. Refer to Figure 155 on page 243.
Caution
Do not over tighten the screws or you may crack or break the plastic
cover.
The plastic cover may not be present if the lead wires were connected
to the terminal block with the right angle terminals. If this is the case,
you may either skip this step or reinstall the plastic cover on the power
supply.
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...