Chapter 8: Installing the Transceivers and Cabling the Ports
168
Section II: Installing the Chassis
Figure 103. Attaching a Fiber Optic Cable to an SFP+ Transceiver in the
AT-SBx81CFC960 Controller Fabric Card
7. Repeat this procedure to install additional SFP+ transceivers in the
AT-SBx81CFC960 Controller Fabric Card.
8. If you are not building a stack with the VCStack Plus feature, do one of
the following:
To install and cable additional transceivers in the chassis, go to the
appropriate section in this chapter for instructions.
After cabling all the ports in the chassis, go to Chapter 9,
“Powering On the Chassis” on page 171.
9. If you are building a stack with the VCStack Plus feature, do the
following:
Double-check the wiring of the cables of the trunk between the
SFP+ slots of the controller cards of the two chassis to be sure
they are correctly connected. The possible wiring configurations
are given in “Cabling Configurations for the Trunk” on page 277.
Summary of Contents for AT-SBx81CFC960
Page 14: ...List of Tables 14...
Page 20: ...20...
Page 34: ...Chapter 1 Chassis and Power Supplies 34 Section I Hardware Overview...
Page 80: ...80...
Page 104: ...Chapter 5 Installing the Chassis in an Equipment Rack 104 Section II Installing the Chassis...
Page 124: ...Chapter 6 Installing the Power Supplies 124 Section II Installing the Chassis...
Page 262: ...Chapter 12 Replacing Modules 262 Section II Installing the Chassis...
Page 270: ...Chapter 13 Upgrading the Controller Fabric Card 270 Section II Installing the Chassis...
Page 272: ...272...
Page 286: ...Chapter 14 VCStack Plus Overview 286 Section III Building a Stack with VCStack Plus...