Allied Telesis AT-SB4151 Quick Install Manual Download Page 4

4

SwitchBlade Chassis and Fan Tray

C613-04029-01 REV C

Blank faceplates for all but one switch controller bay and one line card bay 
(pre-installed at factory). That is, eight faceplates for the SwitchBlade 8 and 
four faceplates for the SwitchBlade 4.

One blank faceplate for each PSU bay (pre-installed at factory).

Two rack-mount brackets (pre-installed at factory).

One 19 inch rack-mount kit.

Two RS-232 DB9 cables for connecting switch controller RS-232 ASYN0 
ports to a terminal or PC.

Two Ethernet patch cables for connecting switch controller RJ-45 ETH0 
ports to a terminal or PC.

One SwitchBlade Documentation and Tools CD-ROM (which includes the 
complete SwitchBlade documentation set and utilities).

One SwitchBlade Chassis and Fan Tray Quick Install Guide.

One Safety and Statutory Information booklet.

One warranty card.

One cable manager with four wire loops (with the SwitchBlade 8 only).

One rack crossbar (to support the chassis’s weight during installation).

Related items that can be purchased separately:

Blank faceplates for switch controller and line card bays (AT-SB4193).

Blank faceplates for PSU bays (AT-SB4192).

Fan trays (AT-SB4152 for the SwitchBlade 8 or AT-SB4151 for the 
SwitchBlade 4).

Blank faceplates for fan tray bays (AT-SB4191 for the SwitchBlade 8 or 
AT-SB4194 for the SwitchBlade 4).

Selecting A Site

The chassis can be installed in a standard 19-inch rack or on a level surface 
such as a sturdy bench. When installing the chassis, choose a site that:

allows adequate airflow around the chassis and its vents. 

is free of dust and moisture.

will allow the chassis and its components to operate within a temperature 
range of 0 to 40º C (32 to 104º F) and a humidity range of 5 to 95% non-
condensing.

has a reliable and earthed (grounded), preferably dedicated and filtered 
power supply circuit.

does not expose cabling to sources of electrical noise, such as radios, 
transmitters, broadband amplifiers, power lines, electric motors, and 
fluorescent fixtures.

allows easy access to the chassis’s power and cable connections.

will allow all related network devices to be connected to the chassis 
without exceeding maximum cable length limitations. See the

 SwitchBlade 

Hardware Reference

 

for cable length specifications.

Summary of Contents for AT-SB4151

Page 1: ...SwitchBlade Chassis and Fan Tray Quick Install Guide...

Page 2: ...o make changes in specifications and other information contained in this document without prior written notice The information provided herein is subject to change without notice In no event shall All...

Page 3: ...e Contents The following items are included with each SwitchBlade chassis These items may arrive in more than one package Contact your sales representative if any items are damaged or missing One Swit...

Page 4: ...y Blank faceplates for switch controller and line card bays AT SB4193 Blank faceplates for PSU bays AT SB4192 Fan trays AT SB4152 for the SwitchBlade 8 or AT SB4151 for the SwitchBlade 4 Blank facepla...

Page 5: ...illips 2 screwdriver screws and cage nuts Due to the chassis size and weight it is recommended that you have someone assist you with the rack mounting procedure 3 Choose a suitable site for the switch...

Page 6: ...6 Insert the blank faceplates if not factory fitted When inserting a faceplate make sure the faceplate s metal back panel is aligned with the card guides see Figure 2 on page 6 Faceplates are mounted...

Page 7: ...ssis the fan tray will be pre installed in the chassis If you purchased a SwitchBlade fan tray without also purchasing a SwitchBlade chassis the following items are included with each fan tray One fan...

Page 8: ...authorised Allied Telesyn distributor or reseller An ESD socket is provided on the front panel of the SwitchBlade chassis The socket is designed to be used in conjunction with an ESD wrist strap see...

Page 9: ...injury or fan damage Figure4 Fan tray ejectors 6 Insert the new fan tray With the fan tray s ejector levers in the unlocked position see Figure 4 on page 9 slide the fan tray into the chassis making s...

Page 10: ...e 6 on page 10 Tighten the mounting screws Figure 6 Installing fan tray faceplate 9 Check the fan tray s operation If the chassis is receiving power and the stand by switch is in the Run position you...

Page 11: ...n on the switch and its hardware features The SwitchBlade Software Reference provides detailed information on configuring the switch and its software The SwitchBlade Power Supply Unit Quick Install Gu...

Reviews: