
AT-IE510-28GSX Installation Guide
77
Figure 37. Positioning the SFP Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 38.
The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.
Figure 38. Connecting a Fiber Optic Cable to a Transceiver
8. Repeat this procedure to install additional transceivers.
Once all transceivers are installed the switch is ready for use.
SFP Handle
Summary of Contents for AT-IE510-28GSX
Page 1: ...613 002101 Rev C AT IE510 28GSX Industrial Ethernet Switch Installation Guide ...
Page 6: ...6 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 44: ...Chapter 2 Virtual Chassis Stacking 44 ...
Page 60: ...Chapter 4 Mounting the Switch 60 ...
Page 72: ...Chapter 5 Wiring the DC Connectors 72 ...
Page 78: ...Chapter 6 Installing SFP and SFP Transceivers 78 ...
Page 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88 ...
Page 116: ...Chapter 10 Powering On the Stack 116 ...
Page 120: ...Chapter 11 Troubleshooting 120 ...