Chapter 8: Verifying the Status of VCStack
94
Figure 53. Returning to the Privileged Exec Mode with the EXIT Command
6. Enter the WRITE command to save your change, as shown in
Figure 54. Saving the Change with the WRITE Command
Note
If this is the initial management session of the switch, the WRITE
command automatically creates in flash memory a new
configuration file called DEFAULT.CFG in which it stores your
configuration change. You may change the name of the file or
designate a different file after you create the stack.
7. Restart the switch with the REBOOT command, as shown in
Figure 55. Rebooting the Switch with the REBOOT Command
8. Type “Y” for yes.
9. Wait one minute for the switch to initialize its management software.
10. Check the ID LED and do one of the following:
If the ID LED is displaying the number 1, 2, 3, or 4, VCStack is now
enabled on the switch. Power off the DC circuit and repeat the
procedures in this chapter on the next switch. If there are no further
switches to test, go to Chapter 9, “Cabling the Stacking Ports” on
page 95.
If the ID LED is still displaying “0,” repeat this procedure. If the
procedure was not successful, it might be because you did not
issue the WRITE command in Step 6 to save your change.
awplus(config)# exit
awplus#
awplus# write
Building configuration ...
[OK]
awplus#
awplus# reboot
reboot system? (y/n):
awplus#
Summary of Contents for AT-IE510-28GSX-80
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 44: ...Chapter 2 Virtual Chassis Stacking 44...
Page 60: ...Chapter 4 Mounting the Switch 60...
Page 72: ...Chapter 5 Wiring the DC Connectors 72...
Page 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Page 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Page 116: ...Chapter 10 Powering On the Stack 116...
Page 120: ...Chapter 11 Troubleshooting 120...