
Cabling the Networking Ports
76
Figure 30. Removing the Dust Cover from the SFP Module
6. If the transceiver is installed in the top slot, verify that the handle is in
the upright position, as shown in Figure 31. If the transceiver is
installed in the bottom slot, verify that the handle is in the down
position.
Figure 31. Positioning the SFP Handle in the Upright Position
SFP Handle
Summary of Contents for AT-FS970M/16F8-LC
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 48: ...Overview 48 Figure 17 System LED System ID LED...
Page 62: ...Beginning the Installation 62...
Page 70: ...Installing the Switch on a Table or in an Equipment Rack 70...
Page 78: ...Cabling the Networking Ports 78...
Page 96: ...Troubleshooting 96...