
FS970M Series Installation Guide
61
The AT-FS970M/24LPS and AT-FS970M/48 Switches come with the
items listed in Figure 20 on page 61.
Figure 20. Components of the AT-FS970M/24LPS and AT-FS970M/48
Switches
Two rack mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
Eight bracket screws
One regional AC power cords
Summary of Contents for AT-FS970M/16F8-LC
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 48: ...Overview 48 Figure 17 System LED System ID LED...
Page 62: ...Beginning the Installation 62...
Page 70: ...Installing the Switch on a Table or in an Equipment Rack 70...
Page 78: ...Cabling the Networking Ports 78...
Page 96: ...Troubleshooting 96...