Installation
8
Site Requirements
Make sure you observe the following site requirements:
‰
Make sure you are placing the switch in a dust-free and moisture-free
environment.
‰
Do not block ventilation openings on the unit. Allow at least 10 cm (4 in)
of space at the front and back of the unit for ventilation.
‰
Make sure that the switch’s power is accessible and cables can be
connected easily.
‰
Cabling should be away from sources of electrical noise such as radios,
transmitters, broadband amplifiers, power lines, and fluorescent fixtures.
‰
Do not place objects on top of the switch.
‰
Use dedicated power circuits or power conditioners to supply power to
the switch.
Desktop Installation
Place the switch on the desktop using these steps, or perform the steps
“Rackmount Installation” on page 9.
1.
Attach the four self-adhesive rubber feet to the bottom of the switch,
positioning them in the indentations.
2.
Place the switch on a flat, level surface where power is easily accessible.
3.
Connect power:
— For AT-FS716 and AT-FS724I, attach one end of the power cord to
the back of the switch and the other end to the power source.
— For AT-FS716E, plug the power adapter into the power receptacle,
then plug the DC connector to the switch.
Note
The switch performs a self-diagnostic test upon power on, and takes about 20
seconds to complete.
4.
Make sure the
3RZHU
LED on the front panel lights green.
5.
Attach the data cables and observe normal operation as indicated by the
port LEDs. For Port 16/24, set the MDI/MDI-X push button as required.