AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
101
Installing the Blank Power Supply Slot Cover
If you installed only one power supply in the chassis, check that the empty
power supply slot is covered with the blank power supply slot cover
included with the chassis. Do one of the following:
If the chassis has two power supplies or if the empty power supply
is already covered, go to “Installing the Power Cord Retaining
Clips” on page 103.
If a power supply slot is uncovered, continue with the procedure in
this section.
To install the bank power supply slot cover, perform the following
procedure:
1. Lift the locking handle on the bank power supply slot cover. Refer to
Figure 56. Lifting the Locking Handle on the Blank Power Supply Slot
Cover
2. Align the cover in the empty power supply slot and carefully slide it into
the slot. Figure 57 on page 102 shows the cover being installed in the
PSU B slot.
Summary of Contents for AT-FAN08
Page 10: ...Figures 10...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 38: ...Chapter 1 Overview 38...
Page 60: ...Chapter 2 Virtual Chassis Stacking 60...
Page 82: ...Chapter 4 Installing the Chassis 82 Figure 34 Example of Adjusting the Equipment Rack Brackets...
Page 104: ...Chapter 4 Installing the Chassis 104...
Page 140: ...Chapter 5 Powering On the Chassis 140...
Page 166: ...Chapter 7 Cabling the AT XEM2 Line Card Ports 166...