Chapter 2: Installing the Hardware
38
Installation Overview
This section lists the procedures for building a stack of the AT-9424Ts,
AT-9424Ts/XP, and AT-9448Ts/XP Switches. The installation procedures
are divided into three chapters and should be performed in the order
presented in Table 7. Allied Telesis recommends printing this table and
placing a check mark beside the procedures as you complete them.
Table 7. Installation Procedures for a Stack
Step
Procedure
Chapter 2, “Installing the Hardware”
1
“Reviewing Safety Precautions” on page 40
2
“Planning the Installation of a Stack” on page 42
3
“Maximum Number of Switches in a Stack” on page 43
4
“Unpacking a Switch” on page 44
5
“Installing the AT-StackXG Stacking Module” on page 45
6
“Installing the Power Cord Retaining Clip (AC Switches
Only)” on page 48
7
“Installing the Switches in an Equipment Rack” on
page 49
Chapter 3, “Preparing the Switches of the Stack”
8
“Verifying the AT-S63 Version Number” on page 52
9
“Choosing Static or Dynamic Module ID Numbers” on
page 55
10
“Labelling the Switches” on page 56
11
“Assigning the Static Module ID Number 1 to the Master
Switch” on page 58
12
“Assigning a Static Module ID Number to the Member
Switches” on page 61
13
“Cabling the AT-StackXG Stacking Modules” on page 62
14
“Powering On the Switches of the Stack” on page 65
15
“Verifying the Installation” on page 67
16
“Troubleshooting the Discovery Process” on page 71
Summary of Contents for AT-9424Ts AC
Page 8: ...Table of Contents 8...
Page 16: ...Preface 16...
Page 36: ...Chapter 1 Overview 36...