Section 3
3 - 15
LINE-IN Pressure Check
All installations without optional
DRAG-BRAKE
LINE-IN Pressure Check
All installations with optional
DRAG-BRAKE
Test Equipment:
•
(1) 5,000 psi (34,474 kPa) Gauge
Connect pressure gauge to port:
•
RI (Tee into existing line)
NOTICE
The values in Table 3-9 are based on
information available at time of publishing.
Refer to the service/maintenance manual
supplied with your dozer to verify the
available pilot pressure.
Instructions
1. With the engine shut off, connect pressure gauge in
line on the
RI
hose at the control manifold.
2. Start dozer and set to high-free idle.
3. Measure pressure with the control lever in the
LINE-
IN
position.
4. Pressure should be as specifi ed in Table 3-9.
If the
LINE-IN
pressure is not as specifi ed in Table 3-9,
check for:
1. Improper pilot supply pressure.
2. Malfunctioning control lever.
3. Leaking pressure hoses or fi ttings.
4. Restriction in pressure hose or manifold port.
Table 3-9 Hydraulic Pressure Readings
Dozer
Pilot Pressure in
PSI [kPa]
Test Port RI
TigerCat
920 (Y46F)
3,185 - 3,335
[21,960 - 22,994]
Figure 3-16 Test Equipment Setup
5000 PSI Gauge
at RI Port
Summary of Contents for H5C Series
Page 8: ...vi Notes...
Page 48: ...General 1 40 Notes...
Page 59: ...Troubleshooting 2 6 Notes...
Page 77: ...Service 3 18 Notes...
Page 86: ...Section 4 4 9 Intentionally Blank...
Page 104: ...Section 4 4 27 Intentionally Blank...
Page 108: ......