
64
39201
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the washer before servicing.
• Never start the washer with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the washer is properly grounded.
W003
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
l. Loosen hose clamp and remove drain hose from
pump outlet. Refer to Figure 53.
m. Loosen hose clamp and remove pressure hose
from pressure bulb.
n. Remove motor wire harness from support leg,
then disconnect wire harness from motor
switch by pressing down on top of connection
block and at the same time pull connection
block away from motor switch. Disconnect
wires from capacitor.
o. Grasp outer tub and lift complete tub module
assembly (with transmission and weldment
assembly attached) straight up and out of
washer cabinet.
p. Turn complete tub module upside-down and set
on protective padding.
q. Remove screw, washer and helix holding drive
pulley to input shaft and transmission
assembly. Refer to Figure 55.
r. Lift drive pulley up and off input shaft of
transmission assembly.
NOTE: When reinstalling pulley, place a small
amount of No. 03200P Lubricant on top side of the
drive pulley that will be contacting large flat
washers. Refer to Figure 55 for assembly sequence.
Lubricate helix ramps and bore with a small
amount of No. 03200P Lubricant. Refer to
Figure 56.
IMPORTANT: DO NOT OVER LUBRICATE!
Excess lubricant can be thrown into pivot dome
area during normal washer operation. Any
lubricant on pivot dome, base or friction ring will
affect washer operation. This condition will persist
until lubricant is removed.
Figure 55
HELIX
W448SE3B
DRIVE
PULLEY
CAP SCREW
WASHER
THICK
WASHER
THIN
WASHER
TRANSMISSION
ASSEMBLY
COUNTERWEIGHT