© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Installation
F232085
22
The threaded end of the bolts should extend 2 inches
(5 cm) above the surface of the floor.
for a typical installation of individual
mounting bolts on a UW60.
A bolt-locator fixture or rebar frame is available as an
option. This rigid welded assembly made of
reinforcing rod and mounting bolts is designed to be
embedded in concrete. Refer to
.
Figure 6
If the existing floor is not reinforced concrete at least
6 inches (15 cm) thick over a solid foundation, cut a
hole approximately 5 feet square through the existing
floor. Excavate to a depth of 6 inches (15 cm) from the
top of the existing floor. Produce a pyramid-shaped
hole by excavating the bottom of the hole to a width
6 inches (15 cm) wider on each side than the width of
the top of the hole. Fill with 6 inches of reinforced
concrete. Embed the mounting bolts or base frame as
the concrete is poured. Ensure that the bolt threads
extend 2 inches (5 cm) above floor level.
NOTE: Concrete should be poured at least
12 inches (30 cm) under the existing floor on all
four sides and tied in with rebar.
PHM178N
1
Frame
2
Grout
Figure 5
1
2
8 in.
(203 mm)
2 in.
(51 mm)
3/4 in.
(19 mm)
P035I
1
Machine Base
2
Mounting Bolt Threads
3
Grouting
4
Reinforcing Rod
P03 I
1
2
3
4