
82
Rockwell Automation Publication 20P-TG001C-EN-P - February 2018
Chapter 3
Part Replacement Procedures
Remove the Current Transducers with No Connection Bars
6. Remove the two M3 x 6 mm screws and washers that secure the top wire
leads to the power traces board.
7. Remove the two stand-offs and washers that secure the bottom wire
leads to the power traces board.
8. Turn the board over and remove the two M3 x 6 mm screws and washers
that secure the AC current transducers to the board and remove the AC
current transducers and windings (if present) from the drive.
9. Continue with Install the AC Current Transducers on page
=
7
6
AC current transducers
Tightening torque:
0.5 N•m (4.4 lb•in)
IMPORTANT
You do not need to remove the windings from the AC current
transducers. However, note the position and number of wire lead
windings for proper installation of the new AC current transducers.
8
Tightening torque:
0.5 N•m (4.4 lb•in)