![Allen-Bradley PanelView Plus 7 Migration Manual Download Page 61](http://html1.mh-extra.com/html/allen-bradley/panelview-plus-7/panelview-plus-7_migration-manual_2900810061.webp)
Rockwell Automation Publication 2711P-AP006C-EN-P - November 2018
61
Chapter
5
Review Object Mapping
Introduction
In this chapter, you review how objects and alarms from PanelBuilder®32
software map to FactoryTalk® View Machine Edition (ME) software.
Before You Begin
• Review migration considerations (Chapter 1).
• Select a PanelView™ Plus 7 terminal replacement and adapter kit, if
necessary (Chapter 2).
• Optionally install the PanelView Plus 7 terminal in the existing
PanelView Standard panel cutout (Chapter 2).
• Import your PanelBuilder32 .pba application into FactoryTalk View ME
software (Chapter 3).
• Review the conversion log for your imported application (Chapter 4).
What You Need
Conversion log generated by the FactoryTalk View ME Import Wizard for the
imported application.
Follow These Steps
Follow these steps to review how PanelBuilder32 objects and alarms map to
FactoryTalk View ME software. This information helps you correct
application errors that are listed in the conversion log.