40
Rockwell Automation Publication 20Y-TG001C-EN-P - April 2017
Chapter 4
AFE Power Structure Component Section
4. Unplug the serial connection from X7 of the control board.
5. Remove the three screws that secure the control board to the control
box, and remove the control board.
Install the I/O Circuit Boards and Control Board
Install the Control and I/O circuit boards in reverse order of removal. See
Torque Specifications on page 36
.
Remove the Fiber-optic Adapter Circuit Board
To remove the fiber-optic adapter circuit board, follow these steps.
1. Remove power from the AFE.
Remove Power from the AFE on page 37
.
2. For an AFE in an IP20 2500 MCC Style enclosure, open the control box
on the enclosure door to access the control assembly.
X2
(Slot A)
X7
Serial Port
X3
(Slot
B)
X4
(Slot
C)
X5
(Slot
D)
X6
(Slot
E)
PZ2
3 N•m
(27 lb•in)
Important:
Do not remove the
enclosure cover from the control frame.
For clarity, the enclosure is shown
without the cover.