5
Notches up
and align the opening at the bottom of the firebox with the opening in the bottom vent door.
This allows the air to flow into the grill and to remove ash with the included ash cleaning tool.
(See Figure 2)
STEP 5
Place the round, black steel fire grate in the bottom of the firebox. The ash will fall
through the holes in the fire grate and collect underneath the firebox. (See Figure 3)
STEP 6
Place the fire ring on top of the firebox with notches up. The notches are used to
secure the legs of the Cooking Grid Elevator. (See Figure 4)
Figure 3 Figure 4
STEP 7
Place the 304 Stainless Steel first level cooking grid on top of the fire ring with the
hinged accessing door in the front of the grill. (See Figure 5)
STEP 8
Close the grill dome and place the 304 stainless steel top vent on top of the dome neck.
Turn the top vent base to make sure the post of the top vent is on the left side. This will prevent
the dampers from sliding when the dome is opened. (See Figure 6)
Figure 5 Figure 6
STEP 9A
Install Front handle with top grill done in the closed position – be careful not to over
tighten the nuts... (See Figure 7)
STEP 9B
Attach the side shelves by placing the front pins in the slots of the shelf brackets that
are installed on the grill. (See Figure 8) (Optional cart and side shelves purchased – if no cart
and side shelves you are finished.)
R
First Level
Cooking Grid
Fire grate
---Fire Ring---
*For 19” Model Only
--Firebox--
Align with
Bottom Vent
L
Top
Vent