
25
Step 3
1. Press in the valve.
2. Pull out the tube (A).
A
Step 4
1. Pump up the tube.
• With a large puncture you can hear the air
escape.
• In case of a smaller puncture, submerge the
tube in water (for example in a bucket).
2. Dry the tube.
3. Mark the puncture with a ballpoint.
Step 5
Repair the tube following the instructions delivered
with the repair kit. Usually the instructions given
below will be sufficient:
1. Clean the place of the puncture with sandpaper.
2. Let the air out of the tube.
3. Apply glue/solvent on an area that is slightly
larger than the sticker.
4. Let the area dry one to two minutes.
5. Remove the release liner from the sticker.
6. Press the sticker firmly on the puncture.
Maintenance
Summary of Contents for R-volution Large
Page 1: ...R volution User manual AL RV 1 0 EN R volution...
Page 2: ......