
Soccer Score Board
- 5 -
3
Installation type FB
The supporting beams must
be anchored in the ground.
We recommend to ask a
local static calculation engi-
neer for help. The supporting
beams must be 100% sta-
bled when you mount the
score board.
Behind the score board you
need one meter of space,
because in case of defects,
repairs have to be done from
the backside.
The supporting beams must
be set up in a distance of 2.9
meters. All measurements in
the drawing are given in mil-
limeters.
We recommend for the sup-
porting beams concrete
pipes that are concreted in
the natural earth. In those
pipes you can put the
beams, align them, and fill
them with gravel.
Both supporting beams have a length of 5.5 m
(1 m inside the ground). In the picture to the
left you can see a cross-section of a support-
ing beam. The measurements are given in
millimetres.