![Algas SDI PHOENIX VH100 Operation & Maintenance Manual Download Page 10](http://html1.mh-extra.com/html/algas-sdi/phoenix-vh100/phoenix-vh100_operation-and-maintenance-manual_2896039010.webp)
Installation
Algas-SDI Operation and Maintenance Manual - VH100-VH200
2-6
Installing the Flame Supervision
Figure 2.2 –
Installing the Flame Supervision
Both UV scanner and flame rod flame supervision options are offered
with Phoenix VH burners. Check the specification sheet to verify
availability.
CAUTION:
7000-volt ignition transformer
must
be used to supply
power to igniter. If equipment other than those that are recommended
are used, performance may vary from Algas-SDI published values.
Install the flame supervision into the ½” NPT opening in the rear cover.
Verify that you connect the flame supervision of a burner to the
electrical circuit of that burner.
WARNING:
If you connect the flame supervision of a burner to the
flame safety system of the wrong burner, you can cause fires and
explosions.
Igniter
Flame
Supervision