![Alfa Laval ThinkTop Basic Digital 10 Instruction Manual Download Page 16](http://html1.mh-extra.com/html/alfa-laval/thinktop-basic-digital-10/thinktop-basic-digital-10_instruction-manual_2895032016.webp)
16
4. Installation
4.4 Electrical connection
A
+
D
C
D
*) Jumper present = PNP. If changing the function a power recycle is necessary.
The selection NPN/PNP is done by the jumper.
Note!
Remember to isolate wires that are not in use.
De-energized (PLC input)
Energized (PLC input)
Activation of solenoid # 1 (PLC output)
Activation of solenoid # 2 (PLC output)
Activation of solenoid # 3 (PLC output)
Supply voltage sensor (+) 10-30 VDC
Supply voltage sensor (0) 0 V
Common supply solenoids
PNP/NPN jumper*)
PNP/NPN jumper*)
Solenoid common, internal connection
Solenoid # 1, internal connection
Solenoid # 2, internal connection
Solenoid # 3, internal connection
Electrical connections
Summary of Contents for ThinkTop Basic Digital 10
Page 1: ...ESE00225EN1 2006 11 ThinkTop Basic Digital 10 30 VDC PNP NPN Instruction Manual ...
Page 2: ......
Page 4: ...4 ...