![Alfa Laval SMP-BC Instruction Manual Download Page 11](http://html1.mh-extra.com/html/alfa-laval/smp-bc/smp-bc_instruction-manual_2894986011.webp)
3 Installation
Study the instructions carefully and pay special attention to the warnings.
The valve has welding ends as standard.
Weld carefully.
Check the valve for smooth operation after welding.
Step 5
Air connection:
R1/8”(BSP)
(additional air supply)
Air
R1/8”(BSP)
Step 6
CIP connection:
1. See description of cleaning and optional extras see sections
4.3 Recommended cleaning and 4.4 Cleaning equipment
(optional extra)
2. Connect CIP correctly.
A = CIP in
B = R3/8” (BSP), external thread
C = CIP out/ leakage drain
A
B
C
TD 430-085_1
3.5
Welding
Step 1
Never stick your fingers through the valve ports if the actuator is
supplied with compressed air.
Air
Cutting danger!
1
11