![Alfa IN PEGAS 200 AC/DC PULSE Smart Operating Manual Download Page 5](http://html1.mh-extra.com/html/alfa-in/pegas-200-ac-dc-pulse-smart/pegas-200-ac-dc-pulse-smart_operating-manual_2894902005.webp)
5/19
ALFA IN a.s. ©
www.alfain.eu
explosion.
19.
To prevent electric shock, we strongly suggest the following rules:
20.
Do not work in a damp or humid environment.
21.
Do not use the welding machine if its cables are damaged in any
way.
22.
Make sure that the earthing system of the electric equipment is
correctly connected and operational.
23.
The operator must be insulated from the metal components
connected to the return wire.
24.
The earthing of the piece being worked could increase the risk of
injury to the operator.
EN 60974-1 Standard: Open-circuit voltage. During the operation of the
machine, the highest voltage, with which it is possible to come into contact, is
the open-circuit voltage between the welding clamps.
The maximum open-circuit voltage of the welding machines is established by
national and international standards (EN 60974-1) depending on the type of
weld current to be used, on its waveform and on the hazards arising from the
work place. These values are not applicable to the strike currents and those for
stabilisation of the arc that could be above it.
The open-circuit voltage, for as many adjustments as possible, must never
exceed the values relating to the various cases shown in the following table:
Case Working conditions
Open-circuit voltage
1
Places with increased risk of
electric shock
DC current: 113V
peak value
AC current: 68V
peak value and
48V effective
2
Places without increased risk
of electric shock
DC current: 113V
peak value
AC current: 113V
peak value and
80V effective
3
Torches held mechanically
with increased protection for
the operator
DC current: 141V
peak value
AC current: 141V
peak value and
100V effective
In case 1, the dc welding machines with rectifier must be built in such a way
that, in case of a fault developing in the rectifier (for example open circuit, short
circuit or lack of power), the permitted values cannot be exceeded.
25.
Before opening the machine switch off the machine and disconnect
it from the power socket.
26.
Only personnel authorised by this company can carry out
maintenance on the machine.
NOTE
Device complies with IEC 61000-3-12 with following conditions:
Short-circuit power S
sc
of network in place at an interface between the user's
supply and the public network (PCC) must be least 4499 kW.
User is obliged to consult with the electricity supplier if the impedance of the
network at this point is that required short-circuit capacity Z
max
= 36 mΩ and