![ALENCON GARD-1000-V2.2 Installation, Operation And Maintenance Manual Download Page 24](http://html1.mh-extra.com/html/alencon/gard-1000-v2-2/gard-1000-v2-2_installation-operation-and-maintenance-manual_2893959024.webp)
GARD – Installation, Operation and Maintenance Manual
A l e n c o n S y s t e m s L L C - P a g e
| 23
Figure 13: Remote E-STOP
The Switch is configured to operate in the NC operation (default).
7.3 GARD Mounting
The suggested mounting orientation of the GARD is the vertical installation where the power
connections are on both sides of the enclosure with the E-Stop switch is directly facing the operator
and the communication ports facing down. The other mounting option is the flat installation where
the E-Stop botton faces upward. No cooling is required for the GARD. When mounting the GARD;
1. Have at least 2 feet of clearance from the ground. Installing the GARD at chest height is
recommended for easy operation and to protect the unit from environmental factors such
as water and snow.
2. At least 18 inches of clearance is recommended from the sides for easy connection of the
power cables.
NOTE: Installation of this equipment must be performed by an authorized electrician in
accordance with the local and NEC ANSI/NFPA 70 and OSHA requirements. Installation
shall be in accordance with the Canadian Electrical Code, Part I when installed in Canada
.