
L1&L2
Service
Manual
TCL
Communication Ltd.
Rev.: 1.0
Venice 5048A_I_U_Y & 5148A_I Level 1 & Level 2 Service Manual
Page: 25/32
All rights reserved. Transfer, copy, use or communication of this file is prohibited without authorization.
rubber
.
Please refer to following guide to paste conductive tape on Rear camera 2:
3) Before assemble the battery on the furnished underfilling, make sure
AI key FPC,
LCD & TP FPC,
LCD FPC HOLE myla
r and
main-sub FPC
are well assembled on the furnished underfilling
4) Before assemble
Sub PCBA
on the furnished underfilling, make sure
Sub PCBA conductive tape
and
Vibrator
are well assembled on the furnished underfilling;
5) Before assemble
Sub PCBA
on the furnished underfilling, make sure
typeC rubber
is well
assembled on the Sub PCBA; and paste
SUB PCBA mylar
on Sub PCBA after assemble sub PCBA
well on the furnished underfilling.
Make sure the 3
edge
parts
of
tape
are
well
pasted
on
the
camera
metal
area
1
2
3