Installing the 7750 SR-12
7750 SR-12
Page 49
Figure 9: Removing the Chassis from the Crate
To unload the chassis from the crate:
Step 1
The chassis is secured to a pallet that has attached wheels. Carefully roll the chassis and
pallet down the ramp and maneuver as close to the equipment rack as possible.
See Key 5 in
.
Step 2
A strap secures the chassis to the pallet. Loosen and remove the strap to remove the
chassis from the pallet. See Key 6 in
Step 3
Remove the anti-static bag from the chassis.
6
5
SR12035
Summary of Contents for 7750 SR-12
Page 1: ...7750 SR 12 INSTALLATION GUIDE Document Part Number 93 0019 01 December 2003 ...
Page 6: ...Page 4 7750 SR 12 Table of Contents ...
Page 14: ...Page 12 7750 SR 12 ...
Page 84: ...Monitoring AC Power Page 82 7750 SR 12 ...
Page 100: ...Establishing Router Connections Page 98 7750 SR 12 ...
Page 150: ...Impeller Trays Page 148 7750 SR 12 ...