Manual switching tests
Description
This test will initiate switching commands from the CIT and verify proper switching and
LED indications.
Important!
An STS-1 cross-connect is required in order to perform manual
switching.
Manual switching test procedure
........................................................................................................................................................................................................................
1
Enter an STS-1 add/drop cross-connection between an equipped Function Unit and the
Main OLIU. Select Configuration -> Cross-Connections... and use the Cross-Connection
Wizard to enter an add/drop cross-connection.
........................................................................................................................................................................................................................
2
Select Fault -> Protection Switch...
........................................................................................................................................................................................................................
3
Under Path Protection choose Path m-1-1 and click Select.
........................................................................................................................................................................................................................
4
Note the Active Path (m1 or m2).
........................................................................................................................................................................................................................
5
Choose Switch Type: Manual.
........................................................................................................................................................................................................................
6
Click Apply.
........................................................................................................................................................................................................................
7
Verify that the Active Path: has changed (m1 to m2 or m2 to m1).
........................................................................................................................................................................................................................
8
to verify a switch back to the original ring.
Summary of Contents for Data Multiplexer Explore 1665
Page 8: ... Contents v i i i 365 372 304R7 1 Issue 1 November 2007 ...
Page 12: ... List of figures x i i 365 372 304R7 1 Issue 1 November 2007 ...
Page 16: ... List of tables x v i 365 372 304R7 1 Issue 1 November 2007 ...
Page 24: ... About this document x x i v 365 372 304R7 1 Issue 1 November 2007 ...
Page 272: ... Final operations Operational tests 5 2 2 365 372 304R7 1 Issue 1 November 2007 ...
Page 326: ... Cleaning pluggable optics modules Fiber cleaning B 1 4 365 372 304R7 1 Issue 1 November 2007 ...
Page 408: ...I N 4 365 372 304R7 1 Issue 1 November 2007 Index ...