START UP AND STOP
For economic and safe use, please read this installation, commissioning,
operation and maintenance manual before starting. Improper installation,
commissioning, operation and maintenance may result in accidents, fire, or
explosion, which could result in injury, loss of property or life.
Preliminary checks to be made before operation;
Before operating the system, ensure that there is no fuel leakage in the
application area. Visual inspection of liquid fuel lines may be sufficient. In
gas-fired systems, heavy gas leakage can be understood from different odors
in the environment. If a gas such as LPG which is heavier than air is used, the
odor control at the ground level must be carried out.
ACTIONS TO BE MADE IF YOU SMELL GAS OR NOTICE LEAKAGE:
•
Do not activate the system.
•
Do not start fire.
•
Do not touch any electrical unit including plugs, light switch.
•
Do not smoke.
•
Do not use any phones in the building where the leak occurs.
•
Close the main fuel valve entering the building.
•
Warn and evacuate other people in the building.
•
Contact your local authorities through your neighbor's phone
immediately.
If you have not detected any fuel leakage;
Check the water system level or pressure.
Make sure that there are no obstructions in front of the ventilation covers.
Ensure that there is no leakage in the water, flue gas lines.
Check the valve positions and ensure that all water valves are in the correct
position.
Make sure that all service, maintenance, replacement, dismantled parts are
securely closed and/or installed correctly.
Make sure that there is no flammable material in the boiler room.
If you have not used the heating system for a long time, make sure that the
water in the system is not frozen.