
OPERATION
SWINGTRIM 03/09
Operation Section 4-15
© 2009 Alamo Group Inc.
OPERA
T
ION
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings.
IMPORTANT
: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve.
•
Ensure fittings are properly connected.
OPS-B- 0023_G
Attention: Oil Filler Cap is also the Pressure Relief Cap.
Remove cap slowly to relieve pressure before removing cap completely. Stay clear to pre-
vent being scalded with hot oil that may spray out of the tank that is still pressurized and may
cause serious injury to eyes, face, and exposed skin.
(Ops-0001-MISC)
Avoid contact with hot surfaces including hydraulic oil tanks, pumps, motors, valves and
hose connections. Relieve hydraulic pressure before performing maintenance or repairs.
Use gloves and eye protection when servicing hot components. Contact with a hot surface
or fluid can cause serious injury from burns or scalding.
(SG-34)
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.
(SG-15)
Summary of Contents for Swingtrim
Page 7: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 73: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 76: ......
Page 77: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 111: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 123: ......
Page 126: ...SWINGTRIM SOM 03 09 Printed in USA P N 00763548C...