6
7
INSTALLATION AND USER MANUAL - STORMER PLUS
Lay the mat flat inside the frame. Make sure the
logo is facing upwards. In order to make the
installation of the jumping mat easier, locate the
four rings in the 12, 3, 6 and 9 o’clock position
directly opposite each other and attach four
springs on these locations first. Then continue by
attaching springs to every eighth ring, followed
by every fourth and so on until all springs are
attached.
At first, it may look like the mat won’t fit, it will
however stretch to the correct size when you
finish attaching all springs.
Fitting the mat and installing the springs
4
Attaching the frame pad
Lay the frame safety pad on top of the trampoline, aligning the pad section joints with the joints of the
frame and the eyelets facing up. Feed the elastic toggles through the eyelets so the loop end of the tie faces
outwards and the toggle end is on the inside.
5
Important:
The frame pad must cover the
entire frame and all springs.
Finally, attach the frame pad with the elastics.
Pull the elastic band around the frame, insert
the toggle into the loop, then rotate the toggle
inwards to secure it. Repeat with all frame pad
elastics.
Installation of the safety net
First, place the enclosure pole that is attached to
the net into the junction part. on the right from
the warnings sign on the frame pad.
Then start inserting the rest of the enclosure
poles into junction parts. Make sure you place
each enclosure pole first through the loop on
the bottom net edge then into the junction part.
Insert the fiberglass rods into the flaps on the
top edge of the safety net Push all the fiber glass
rods together and connect them into a ring.
Now push the obtained ring into the plastic caps on the
top of each enclosure pole into the position shown on the
picture below.
6
7
8
AKROBAT HINT:
Springs can be hard to attach, you will need a little force. Help
yourself by using one spring to pull another towards the frame
holes. Do not forget to wear gloves!
Important
:
Be sure all spring hooks
are well attached to the frame.
When flipping the frame pad over, align the pad
according to where the safety net entrance will
be placed:
The opening of the net should be positioned
between two trampoline legs and the frame pad
section with the warnings print should mark this
entrance. Before attaching the elastic toggles,
make sure the pad section joint at the enclosure
pole junction part is set about 1 cm to the left of
the junction part as shown on the picture.
9
In order to fix the fiberglass rods in place, put
the velcro tape across the fiberglass and attach
it to the pole on the other side of the cap.