background image

12162021JA                                   

       

www.akiascreens.com     

                  

U-00206 

Center Support Bar

 

Step 8:

 Insert the 

Center Support Bar 

(o)

  into  the  upper  top  groove  on  the 

back of the frame with the bottom end 

near  the  approximate  center  point  of 

the frame and rotate it in at an angle so 

that  both  ends  of  the  bar  are  in 

alignment with the groove. 

 

Step 9: 

Hook one end of the spring and secure inside the groove of the frame, use the 

spring hook (i)

 to attach the 

spring to the hole located on the screen material’s outer edge in the following order. 

 

Begin by first attaching the center points on both vertical (left/right) sides, 

steps 1-2

. Then the center points on both 

horizontal (top/bottom) sides, 

steps 3-4

. Once all center points have been secured, make sure the screen material is 

still within the marked areas before proceeding to attach the next springs.  

 
Continue attaching the rest of the springs to the material in the following order in 

steps 5-12

 
 
 

 

 

 
 
 
 
 
 
 
 
 
 
 

To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around the 

edges as illustrated in the check mark diagrams. 

 

o. 

h. 

i. 

5

 

6

 

7

 

8

 

9

 

11

 

10

12

 

1

 

2

 

3

 

4

 

Summary of Contents for EDGE FREE CLR 4

Page 1: ...dirt and scratches on the projection screen surface will affect the quality and performance of the projection image Follow the instructions below to properly maintain the screen 1 The screen surface has a horizontal linear structure DO NOT wipe the screen up and down or in a circular motion Wipe gently from left to right only 2 Clean the dust on the screen surface with a soft brush or microfiber c...

Page 2: ...and Edge Trim Parts List Qty Item 2 pcs Main Frame Parts Qty item 2 pcs Edge Trim Parts Part A vertical frame Part D Part B horizontal frame Part E Part C horizontal frame Part F 2 Hardware Parts List a M4 4 b D5 4 c M4 4 d DD5 4 g h i j k l m n o p q ...

Page 3: ...ow joints c d to the top and bottom sections of the vertical frame Once inserted connect the vertical sections to the horizontal frame sections Make sure all holes are in alignment and the frame pieces are flush no gaps They should form perfect right angles Tip The elbow joint d with the larger diameter holes should be on top Item Parts List 115 a Center Joints M4 bottom position 6 b Center Joints...

Page 4: ...e on top of the screen material in the marked areas as shown below Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoid puncturing it CAUTION THE PROJECTION FABRIC IS A DELICATE OPTICAL LENTICULAR SCREEN MATERIAL AND SHOULD NOT BE FOLDED BENT OR CREASED ALWAYS MAINTAIN SCREEN MATERIAL FLAT AND TAUT DURING SETUP AND DISASSEMBLY TWO PEOPLE AR...

Page 5: ...the screen material s outer edge in the following order Begin by first attaching the center points on both vertical left right sides steps 1 2 Then the center points on both horizontal top bottom sides steps 3 4 Once all center points have been secured make sure the screen material is still within the marked areas before proceeding to attach the next springs Continue attaching the rest of the spri...

Page 6: ... does not lie flat along the edge of the frame reposition the material so that it lies flat and wraps along the edge of the frame and reattach springs to the material Attention Do not proceed with the Edge Trim installation until making sure there are no ripples in the material Edge Trim Installation Step 10 Place the edge trim frame pieces over each end of the frame Connect edge trim frames E F t...

Page 7: ...he bezel trim Notice to Installer Material Tip Proper Projector Placement for CLR 4 The CLR 4 is exclusively for tabletop bottom mounted ultra short throw projectors Overhead placement or a standard projector will make the image very dark on account of the screen s absorbent layer deflecting light that is not aligned with its reflective angle 1 2 2 1 2 screen screen Tear off the double sided tape ...

Page 8: ...n screw in the M5x50 wood screws with a screwdriver Make sure the brackets are leveled Step 14 Position the fixed frame screen onto the bottom brackets fig 1 as shown below and push down at the center of the top of the frame on the top bracket fig 2 to secure the frame installation For Technical Support or an Akia contact in your area visit www akiascreens com Model Size X Wall bracket distance X1...

Reviews: