Software upgrade Process
- Power Switch OFF.
- Connect the serial port of the control device to the RS-232 jack on the LCD-TV back panel.
RS-232C connection cables are not supplied with the LCD-TV.
- Power Switch ON. The power indicator on the front of the panel should now display red, means
that the LCD-TV is in standby mode.
- Copy the software (MTKTOOL) to the computer.
- Open the software (MTKTOOL.EXE)
- Select MTK 8205 and Point "browse" on the interface of the MTKTOOL.exe.
- Select the file which will be update.
- Point "update" on the interface of the MTKTOOL.exe.
- Waiting for the upgrader programing, when it is finished, the bar will display 100%.
- After the upgrader
is finished, shut down the power switch, take out the RS-232C connection
after the power indicator is extinguished.
Note: After upgrading, the first time of power on will be some long.
104
/
105
Summary of Contents for LCT2765TD
Page 35: ... 4ˋ ...
Page 36: ...IC DESCRIPTION MT8205G AT24C02 MX29LV160BBTC LP2996 AZ1117 H WM8776 MX232A ISAV330 5ˋ ...
Page 44: ...37 75 ...
Page 98: ...Preliminary 11 MECHANICAL CHARACTERISTICS CHI MEI 奇美電子股份有限公司 97ˋ ...
Page 99: ...I Preliminary 奇美電子股份有限公司 CHI MEI 98ˋ ...
Page 101: ...100ˋ ...