![AISWEI A10081-00 Manual Download Page 36](http://html.mh-extra.com/html/aiswei/a10081-00/a10081-00_manual_2880475036.webp)
AISWEI Cloud
~
36
~
Step1: Login into AISWEI Cloud and enter the Configuration
→
Shared Configuration
page.
Fig. 7-6: PV plant sharing
Step2: Click
, an “Add a shared user window” will appear; enter the user
account that needs to be shared.
Step3: In the check box in Fig. 7-6, you can configure the authorities of the shared
users.
7.6
Configuration Report
AISWEI Cloud can email you the daily and monthly operation state of the PV plant,
including the amount of generated energy, yield, CO
2
emission reduction and other
information. In addition it can also inform you of events of the PV plant by email.
This function can be configured as follows:
Step1: Login to AISWEI Cloud and enter Configuration
→
Report Configuration page.
Step2:
First click “
No
” to activate this function as shown in Fig. 7
-7.
Fig. 7-7: Activate the configuration report
Step3: After the
above steps, click the “Save” button to save your settings, then click
“
Test
” button to send to an email immediately.