48
Eubank 7AA1024A-1060A & 7AA2036A-2060A I&O Manual
07/2021 Rev.3
Chapter 8 Start-Up Check List
8.1 Start-Up & Commissioning Form
Please complete the information on this form and return to Eubank by mail or fax. The mailing address
and fax number can be found at the end of the form.
A. Equipment Information
Date: ________________Equipment Owner _______________________________________
Installing Company: _____________________________Installer: ____________________
Address: _______________________________________State _______________________
City: __________________________________________
ICE Air conditioner:
Model No. _____________________________________________
Serial No. _____________________________________________
Compressor:
Model No. _____________________________________________
Serial No. _____________________________________________
Compressor:
Model No. _____________________________________________
Serial No. _____________________________________________
B. Pre-Start Up
Is there any shipping damage?
❒
Yes
❒
No
If so, where? ________________________________________________________________
Will this damage prevent starting the unit?
❒
Yes
❒
No
Check Power Supply, does it agree with data sticker on air conditioner?
❒
Yes
❒
No
Has the ground wire been connected?
❒
Yes
❒
No
Has the circuit protection been sized and installed properly?
❒
Yes
❒
No
Controls
Are the thermostat control wiring connections made and checked?
❒
Yes
❒
No
Are all wiring terminals (including main power supply) tight?
❒
Yes
❒
No
If unit has a crankcase heater, has it been energized for 24 hours?
❒
Yes
❒
No
On a 208/230 v. units is control transformer (24 AC) wired for correct voltage?
❒
Yes
❒
No
Condensate Section
Has water been placed in drain pan to confirm proper drainage?
❒
Yes
❒
No
Are correct filters in place?
❒
Yes
❒
No
Refrigerant Piping
If leaks are found, report any leaks to Eubank Warranty Service Dept.