background image

Installation Height

Height Code

DS11

DS12

2.3-2.7(m)

H0

OFF

OFF

2.7-3.1(m)

H1

OFF

ON

3.1-3.5(m)

H2

ON

OFF

>3.5(m)

H3

ON

ON

Note

1.Please disconnect the unit from power

   supply when change these settings.

2.If you feel too noisy, please set DS11 and 

   DS12 to lower height code level.

5

ELECTRICAL WRING CONNECTION

Power supply wiring

Main bus communication and R/C wiring

1.Unscrew and remove the  electrical box cover.

2.Connect the power supply wiring to  the power 

supply terminal block.

3.When doing this,press the power supply wiring 

under the wire clip.

1.Unscrew and remove the electrical box cover.

2.Connect the R/C wirings to R1'R2 terminal block and the 

main bus wirings to F1'F2 terminal block. 

3.Press the wirings under the wire clip tightly.

1-1.5m

Lean over 1/50 

›1.5m

Chart 16

Constrict here 

Drain pipe

Linking pipe

Pump-pipe clasp

 (the fittings)

<200mm

<200mm

 <1-1.5mm  Lean over 1/50

Chart 17

Water-

receIver

Test cover 

Pump joint

Test mouth

Stow tube

Drain plug

Chart 18

Body

KXV021/024       C=200mm

KXV030/036       C=212mm

  B.Drainage test

    ● Check whether the drainpipe is unhindered.

    ● New built house should have this test done before paving the ceiling. 

       ●  For VRF system please do drainage test after finishing all installations, wiring and piping included, and doing ITEST (Installation test ) 

           sucessfully:

      1) Refer to chart 18.

        2) Turn on the power, and operate the air conditioner under the “COOLING” mode. Listen to the sound of the drain pump. Check whether the

               water is discharged well (a long of 1 min is allowed before discharging, according to the length of the drain pipe), and check whether water

               leaks from the joints.

  CAUTIONS: 

If there is any malfunction, please resolve it immediately.

     

3) Stop the air conditioner, turn off the power, and reset the test cover to its original position.

    ● Imposition at all times during operation to avoid leakage.

Tightening to torque for the terminal screws

●  Use the correct screwdriver for tightening the terminal screws.If the blade of screwdriver is too small, the head of the screw might be damaged, and 

the screw will not be properly tightened.

●  If the terminal screws are tightened too hard, screws might be damage.

●  Refer to the table below for the tightening torque of the terminal screws.

Terminal

Size

Tightening torque

Remote controller and main bus communication wiring and forced off 

terminal block(4P)

M3.5

0.8~1.0N.m

Power supply and Ground terminal block(3P)

M4

1.2~1.5N.m

4

HEIGHT COMPENSATION SETTING

The compensation setting according to installation height can be done by using the dip switch 11 and 12 on controller PCB.

NOTE: 

For how to cnnect the power wire and communication wire between outdoor unit and indoor units, please refer to chapter 9 “Field    

Wiring” in outdoor unit installation manual.

Reviews: